Question: Please use below templates information to create a Project Gantt Chart. Required Information. Gantt Chart Template to be filled out. From the below Gantt Chart

Please use below templates information to create a Project Gantt Chart.

Required Information.

Please use below templates information to create

Please use below templates information to create

Gantt Chart Template to be filled out. From the below Gantt Chart template we don't work on Saturday's and Sunday's

Please use below templates information to create

Individual Project Information (Part 3) Network Diagram Information The table below lists each work package with its duration and precedence description: Work package Duration Predecessors (days) 1.1 Demolition: remove and haul away all old 2 None appliances, cabinets, and flooring 2.1 Order cabinets 2 1.1 2.2 Order sink/faucet 1 1.1 2.3 Order appliances 1 1.1 2.4 Order paint 1 1.1 3.1 Create countertop subcontract 1 2.1 & 2.2 3.2 Create tile subcontract 2 2.3 3.3 Create painting subcontract 1 2.4 4.1 Install cabinets 3 3.1 4.2 Install countertop 1 3.2 & 4.1 4.3 Install tile floors 3 4.2 4.4 Install sink/faucet 1 4.3 4.5 Install appliances 2 3.3 & 4.3 5.1 Paint walls & ceiling 2 4.4 & 4.5 6.1 PM Inspection/punchlist 1 5.1 6.2 Walk through / acceptance 1 6.1 window Warnok Views All Panes Show Windows Zoom Window Macros 09 Demolition A B E F G H 1 K MN 1 0 P Q R S U V w X Y z AA AB AB AC AD AE AF AG 2 2.1 4 0 Order Cabinets 2 2 4 4 5 6 7 3.1 5 Create countertop subcontract 1 5 0 4 5 4.1 8 Install 0 Cabinets 5 3 8 12 4.4 13 Install 1 sink Faucet 13 1 14 2 2.2 3 1 Order sink\faucet 3 1 4 01.1 2 o Demolition 0 2 2 10 2 2.3 3 3 5 Vertical Value) Axis Major Gridlines 84.21 9 9 4.3 12 Install Install tile 0 Countertop 0 Floors 8 1 9 9 3 12 3.2 Create tile subcontract 2 3 Order appliances 5 1 6 3 6 14 5.1 16 Paint walls O and ceiling 14 2 16 16 6.1 17 PM Inspection o punchlist 16 1 1 17 17 62 18 Walk through O acceptance 17 1 18 8 2 2.4 3 3 3 3.3 4 Create painting subcontract 1 12 8 8 8 10 Order paint 1 11 12 4.5 14 Install o appliances 12 214 11 ES ID EF SLACK Description 5 DUR LE Total Duration18 Days 15 20 23 Critical Path 1.1 2.1-3.1-4.1 -4.2-4.3-4.5-5.1-61-62 Gantt Chart Gantt Chart PM: WEE MER ws Sun Mon Tus We THE Sot Men Wiec WES Taak Name WESID Duration Indicate task duration Indicata lask slask Individual Project Information (Part 3) Network Diagram Information The table below lists each work package with its duration and precedence description: Work package Duration Predecessors (days) 1.1 Demolition: remove and haul away all old 2 None appliances, cabinets, and flooring 2.1 Order cabinets 2 1.1 2.2 Order sink/faucet 1 1.1 2.3 Order appliances 1 1.1 2.4 Order paint 1 1.1 3.1 Create countertop subcontract 1 2.1 & 2.2 3.2 Create tile subcontract 2 2.3 3.3 Create painting subcontract 1 2.4 4.1 Install cabinets 3 3.1 4.2 Install countertop 1 3.2 & 4.1 4.3 Install tile floors 3 4.2 4.4 Install sink/faucet 1 4.3 4.5 Install appliances 2 3.3 & 4.3 5.1 Paint walls & ceiling 2 4.4 & 4.5 6.1 PM Inspection/punchlist 1 5.1 6.2 Walk through / acceptance 1 6.1 window Warnok Views All Panes Show Windows Zoom Window Macros 09 Demolition A B E F G H 1 K MN 1 0 P Q R S U V w X Y z AA AB AB AC AD AE AF AG 2 2.1 4 0 Order Cabinets 2 2 4 4 5 6 7 3.1 5 Create countertop subcontract 1 5 0 4 5 4.1 8 Install 0 Cabinets 5 3 8 12 4.4 13 Install 1 sink Faucet 13 1 14 2 2.2 3 1 Order sink\faucet 3 1 4 01.1 2 o Demolition 0 2 2 10 2 2.3 3 3 5 Vertical Value) Axis Major Gridlines 84.21 9 9 4.3 12 Install Install tile 0 Countertop 0 Floors 8 1 9 9 3 12 3.2 Create tile subcontract 2 3 Order appliances 5 1 6 3 6 14 5.1 16 Paint walls O and ceiling 14 2 16 16 6.1 17 PM Inspection o punchlist 16 1 1 17 17 62 18 Walk through O acceptance 17 1 18 8 2 2.4 3 3 3 3.3 4 Create painting subcontract 1 12 8 8 8 10 Order paint 1 11 12 4.5 14 Install o appliances 12 214 11 ES ID EF SLACK Description 5 DUR LE Total Duration18 Days 15 20 23 Critical Path 1.1 2.1-3.1-4.1 -4.2-4.3-4.5-5.1-61-62 Gantt Chart Gantt Chart PM: WEE MER ws Sun Mon Tus We THE Sot Men Wiec WES Taak Name WESID Duration Indicate task duration Indicata lask slask

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!