Question: PM Problem (Exercise 4). Determine the project's cost and duration alternatives. Times (durations) in days, costs are in $K. Perform three cycles of the

PM Problem (Exercise 4). Determine the project's cost and duration alternatives. Times

PM Problem (Exercise 4). Determine the project's cost and duration alternatives. Times (durations) in days, costs are in $K. Perform three cycles of the process: determine the crash design, the normal design, and the next two designs (a total of 4 project designs). Code NT CT NC Prec. A 12 10 50 100 B 16 12 70 100 A C 9 6 45 84 A D 9 4 80 200 B, C E 20 20 30 30 C F 8 8 50 65 G B 1 20 100 B, C D Provide the following answers here but be sure to upload all your work after the exam, 1. Crash design duration: 2. Normal design duration: 3. Normal design critical path: (type only the number) (type only the number) (do not place separators between the letters, for example if the critical path is X-Y-Z write XYZ) 4. What activity will be crashed in this iteration: 5. Project cost after first crash: dollar sign, or K letter) 6. Project cost after second crash: commas, dollar sign, or K letter) (a letter) (type only the number with no commas. (type only the number with no

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!