Question: Prepare a network diagram of a certain project using PERT method (search the net for examples on PERT). The report should Include: Introduction to project


  1. Prepare a network diagram of a certain project using PERT method (search the net for examples on PERT). The report should Include:
    • Introduction to project planning and scheduling.
    • List of activities at least (15) activites, the relationship between activities
    • The duration of each activity; each activity will have 3 values (a, m, b) and the expected value for each activity duration will be calculated.
    • Sample calculation
    • Discussion of the results and stated in point 8 and 9 bellow.
    • Conclusions and recommendations
    • References
  2. Draw the network diagram using AON and AOA methods.
  3. Then calculating the project duration using PERT (use the three values of activity duration).
  4. Calculating expected time, standard deviation and variance for each activity.
  5. Calculate the project expected duration, standard deviation and variance using the three values of the activities duration (a, m, b) for PERT.
  6. Calculation the project duration for AOA and AON using only the m values for the activities duration; the most likely values for each activity.
  7. Determine the critical activities and the critical paths based on the above results.
  8. Discuss briefly the important of planning and its effects on the project impact on the economics and environment in general.
  9. Compare the different planning solution, select the best solution (most economical solution) and justify your selection.
  10. Examine the interest of the different parties in a projects, i.e. clients, main contractor, subcontractors and the consultant.
  11. Compare the requirements of the different parties in a construction project
  12. Allocate the required resources for each activity (assuming the minimum number of the required resources).
  13. Do resources leveling based on the comparison between all activities are executed on its ES and LS.
  14. Crash the project duration by reducing in 3 days, then determine the crash time and cost of the project.

3. General Requirements

A proper report, either neatly hand written or typed, should be submitted. Important references should be given through citations. Whenever necessary, sketches should be drawn with a ruler. Report should include a copy of this assignment paper and its Rubric, important input/output data and sketches.

6. Assignment Evaluation

While evaluating the assignment the following rubric will be used:

  1. Each criterion will be rated according to scores combined with levels of performance.
  2. The total score of the assignment is out of 30for the assignment.

Criteria Points

Low

(1)

Need improvement

(2)

Good

(3)

Excellent

(4)

Propose different engineering solution to the project network

Show weak understanding of the project planning solution and its impact on the project economics and environment Show little understanding of the project planning solution and its impact on the project economics and environment Show good understanding of the project planning solution and its impact on the project economics and environment Show excellent understanding of the project planning solution and its impact on the project economics and environment
Content of the report Content conveys little of the assignment detail. Content conveys some of the assignment detail. Content conveys most of the assignment detail. Content of the report conveys all of the detail of the assignment.
Ability to show engineering judgments to select from the different solution

Show weak ability to use his own judgment to justify his decision

Show little ability to use his own judgment to justify his decision

Show good ability to use his own judgment to justify his decision

Show excellent ability to use his own judgment to justify his decision

Citation and use of References Most references that are included are inaccurate or unclear. Bibliographical entries are not complete. Most references that are included are accurate or clear. All references that are included listed and accurate

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Creating a comprehensive project plan requires careful consideration of various aspects including activity sequencing resource allocation and risk management Heres a structured approach to address the ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!