Problem 1: Use the information contained below to compress one time unit per move using the...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Problem 1: Use the information contained below to compress one time unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. For each move identify what activity(s) was crashed the adjusted total cost. Act. A abo - khô khi B C F Crash Cost (Slope) 0 100 50 A 1x 60 70 90 Maximum Crash Time 0 2 1 1 2 1 丹丹 15 E w+ 3 Normal Time 1 3 4 3 4 3 Initial project duration 12 Total direct cost $ Normal Cost 100 150 200 200 200 150 Problem 2: Teloxy Engineering has received a onetime contract to design and build 10,000 units of a new product. During the proposal process, management felt that the new product could be designed and manufactured at a low cost. One of the ingredients necessary to build the product was a small component that could be purchased for $60 in the marketplace, including quantity discounts. Accordingly, management budgeted $650,000 for the purchasing and handling of 10,000 components plus scrap. During the design stage, your engineering team informs you that the final design will require a somewhat higher-grade component that sells for $72 with quantity discounts. The new price is substantially higher than you had budgeted for. This will create a cost overrun. You meet with your manufacturing team to see if they can manufacture the component at a cheaper price than buying it from the outside. Your manufacturing team informs you that they can produce a maximum of 10,000 units, just enough to fulfill your contract. The setup cost will be $100,000 and the raw material cost is $40 per component. Since Teloxy has never manufactured this product before, manufacturing expects the following defects: % defective 0 Probability of occurrence (%) 10 10 20 20 30 30 25 40 15 All defective parts must be removed and repaired at a cost of $120 per part. 1. Using expected value, is it economically better to make or buy the component? 2. Strategically thinking, why might management opt for other than the most economical choice? Problem 1: Use the information contained below to compress one time unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. For each move identify what activity(s) was crashed the adjusted total cost. Act. A abo - khô khi B C F Crash Cost (Slope) 0 100 50 A 1x 60 70 90 Maximum Crash Time 0 2 1 1 2 1 丹丹 15 E w+ 3 Normal Time 1 3 4 3 4 3 Initial project duration 12 Total direct cost $ Normal Cost 100 150 200 200 200 150 Problem 2: Teloxy Engineering has received a onetime contract to design and build 10,000 units of a new product. During the proposal process, management felt that the new product could be designed and manufactured at a low cost. One of the ingredients necessary to build the product was a small component that could be purchased for $60 in the marketplace, including quantity discounts. Accordingly, management budgeted $650,000 for the purchasing and handling of 10,000 components plus scrap. During the design stage, your engineering team informs you that the final design will require a somewhat higher-grade component that sells for $72 with quantity discounts. The new price is substantially higher than you had budgeted for. This will create a cost overrun. You meet with your manufacturing team to see if they can manufacture the component at a cheaper price than buying it from the outside. Your manufacturing team informs you that they can produce a maximum of 10,000 units, just enough to fulfill your contract. The setup cost will be $100,000 and the raw material cost is $40 per component. Since Teloxy has never manufactured this product before, manufacturing expects the following defects: % defective 0 Probability of occurrence (%) 10 10 20 20 30 30 25 40 15 All defective parts must be removed and repaired at a cost of $120 per part. 1. Using expected value, is it economically better to make or buy the component? 2. Strategically thinking, why might management opt for other than the most economical choice?
Expert Answer:
Answer rating: 100% (QA)
ANSWER In this network there are two paths These two paths and their respective lengths are listed b... View the full answer
Related Book For
Project management the managerial process
ISBN: 978-0073403342
5th edition
Authors: Eric W Larson, Clifford F. Gray
Posted Date:
Students also viewed these accounting questions
-
Use the information contained below to compress one time unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. For each move identify what...
-
Use the information contained below to compress one time unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. For each move identify what...
-
According to a survey study conducted by Rossi (2013), the exchange rate predictability depends on: 1 sample period and model 2 the choice of predictor 3 forecast horizon and evaluation method 4 all...
-
At RM Sharpton Corporation, the engraving department is a bottleneck, and the company is considering hiring an extra worker, whose salary will be $45,000 per year, to mitigate the problem. With the...
-
The acidity of a chemical solution can be classified as "very high." 'high." 'normal." "low," and "very low." A total of 630 samples of the solution from a production process were obtained, and the...
-
A _______________ interval estimates the y-value for a particular individual with a given x-value. In Exercises 3 and 4, fill in each blank with the appropriate word or phrase.
-
Olthof Company purchased 15,000 pounds of raw materials at $3.00 per pound. The companys standard cost per pound is $2.50. Calculate the materials price variance for this purchase.
-
SS is evaluating a project that might help the firm to increase its presence in the "green" industry by propelling the company into the leadership role in the country's quest to clean up and protect...
-
The trial balance of Norr Ltd at 31 December 20X2 appeared as follows: Additional information 1. During the year a motor vehicle purchased on 31 March 20W9 for 8,000 was sold for 3,000. The sale...
-
Patents may be playing an important role in determining the pace of economic growth of a country. Why?
-
To what extent does organizational culture, leadership ethos, and employee empowerment initiatives shape the fabric of operational efficiency within organizations, fostering a sense of ownership,...
-
Risk and Return Suppose you observe the following situation: Security Cooley Inc Moyer Company Beta Expected Return 1.8 22.00% 1.6 20.44 If the risk-free rate is 7%, are these securities correctly...
-
Procedure 4. Find five circular objects with different diameters. These could be objects such as a food or drink cans, balls of different kinds, a broom stick, or any other object around you. A paper...
-
A chlorine (CI) and bromine (Br) atom are adsorbed on a small patch of surface (see sketch at right). This patch is known to contain 36 possible adsorption sites. The Cl and bromine (Br) atoms have...
-
Nolan Walker decided to buy a used snowmobile since his credit union was offering such low interest rates. He borrowed $4,400 at 4.75% on December 26 2021 and paid it off February 21, 2023. How much...
-
Mr Acquirer wants to acquire Target Ltd . but Target's board of directors has so far rejected a friendly merger. With no other option left, Acquirer is going for a tender offer directly to Target's...
-
The company manufactures three products: wooden chairs, tables and dressers. AFC started off as a 'Mom & Pop' shop but has grown rapidly. AFC uses one assembly line to build all three products,...
-
Given the time-phased work packages and network, complete the baseline budget form for theproject. Market Survey Project WBS Work Package Cost by Week WP Design 4 5 2 WP Survey 2244 4 5 WP Report 3 3...
-
What is the difference between free slack and total slack?
-
Use the information found in the text exercise 11 to draw an AOA network. Include the activity times and event nodes on the network as shown in Figure. Activity-on-Arrow NetworkFigure 4 15 15 0 3 10...
-
A homogeneous disk of weight \(W\) and radius \(r\) is supported by two identical cylindrical steel shafts of length \(l\), as shown in Figure 2.70. From solid mechanics, for each shaft the relation...
-
A simple pendulum of initial length \(l_{0}\) and initial angle \(\theta_{0}\) is released from rest. If the length is a function of time according to \(l=l_{0}+\varepsilon t\), find the position...
-
When a manned craft is sent into space it is necessary to know the mass properties of the system, including the moment of inertia of astronauts on the flight, in order to accurately calculate its...
Study smarter with the SolutionInn App