Question: Problem 14-2 (Algo) Using the BOM shown below, 2 weeks C (3) B (4) 1 week 2 weeks D (2) 2 weeks E (4) 5.4

Problem 14-2 (Algo) Using the BOM shown below, 2

Problem 14-2 (Algo) Using the BOM shown below, 2 weeks C (3) B (4) 1 week 2 weeks D (2) 2 weeks E (4) 5.4 weeks F (1) 6.4 weeks C (2) 2 weeks E (3) 5.4 weeks What is the cumulative lead time for end item A? (Round your answer to 1 decimal place.) Cumulative lead time weeks