Question: PROBLEM # 2 ( 4 0 Points ) : Class AA Concrete is required for a bridge pier pile cap in contact with the ground
PROBLEM # Points:
Class AA Concrete is required for a bridge pier pile cap in contact with the ground in
Seabrook, NH You have the following coarse and fine aggregates available:
Coarse Aggregates: inch Nominal Maximum Size ASTM C gravel, Bulk Specific
Gravity ovendry; Absorption SSD Saturated Surface Dry and an
ovendry rodded bulk density unit weight; Lab trail batching moisture
content
Fine Aggregates: Sand Bulk Specific Gravity ovendry; Fineness Modulus
FM