Question: Problem 2 . For the constant head permeameter in the figure below deter ane the total head, pressure head and elevation head for points a

Problem 2.
For the constant head permeameter in the figure below deter ane
the total head, pressure head and elevation head for points a,b,c,d,
and e.
*hint: this figure is drawn to scale.