Question: Problem 2 : Network distribution problem with integer decision variables: Topics: Recommended Preparation: Difficulty: Transportation problem with plant open / close decisions LP formulation with

Problem 2: Network distribution problem with integer decision variables:
Topics:
Recommended Preparation:
Difficulty:
Transportation problem with plant open/close decisions
LP formulation with binary integer decisions
Medium
Refer to the GlobChem example discussed in class (Module 4- Lecture Slides starting from Slide 18 and
the Excel file is also available in Module 4). In the original problem setup, it is assumed that each of the
four plants has an annual fixed cost which is incurred regardless of the production volume. Since
GlobChem's total demand is only about 78% of its worldwide capacity, senior management wants to
explore the possibility of downsizing capacity. Shutting down a plant will save the annual fixed operating
expenses of the plant (which are incurred in full if the plant is open, regardless of the production
volume).
Question: The Company needs to determine which plants they should continue to operate and
subsequently decide the annual production and transportation schedule to maximize their net annual
profit (with all costs considered), ensuring that plant capacity and market demand limits are not
 Problem 2: Network distribution problem with integer decision variables: Topics: Recommended

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!