Question: Problem 2 : Network distribution problem with integer decision variables: Topics: Recommended Preparation: Difficulty: Transportation problem with plant open / close decisions LP formulation with
Problem : Network distribution problem with integer decision variables:
Topics:
Recommended Preparation:
Difficulty:
Transportation problem with plant openclose decisions
LP formulation with binary integer decisions
Medium
Refer to the GlobChem example discussed in class Module Lecture Slides starting from Slide and
the Excel file is also available in Module In the original problem setup, it is assumed that each of the
four plants has an annual fixed cost which is incurred regardless of the production volume. Since
GlobChem's total demand is only about of its worldwide capacity, senior management wants to
explore the possibility of downsizing capacity. Shutting down a plant will save the annual fixed operating
expenses of the plant which are incurred in full if the plant is open, regardless of the production
volume
Question: The Company needs to determine which plants they should continue to operate and
subsequently decide the annual production and transportation schedule to maximize their net annual
profit with all costs considered ensuring that plant capacity and market demand limits are not
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock