Question: Problem 3 ( 2 5 % ) At some phase in the design process the scheduling data in Table 2 and Table 3 have been

Problem 3(25%)
At some phase in the design process the scheduling data in Table 2 and Table 3 have been
generated.
Table 2: Resources needed
Table 3: Reward Index
a. Are there enough resources to schedule all six design activities? (Calculate bi)
 Problem 3(25%) At some phase in the design process the scheduling