Question: Problem 3 ) ( 3 5 points ) Draw the AON network for the following project and answer the questions that follow. a ) Determine

Problem 3)(35 points)
Draw the AON network for the following project and answer the questions that follow.
a) Determine ES,EF,LS,LF, and slack for each activity and then determine the total project
completion time and the critical path for the project.
a) Crash this project to the maximum days it can be crashed at the least cost. Fill out the table
for each day that the project is crashed.
 Problem 3)(35 points) Draw the AON network for the following project