Question: Problem 4 : A baseline for a pre - engineering survey runs down a steep hill. Rather than measure horizontally downhill with the steel tape,

Problem 4: A baseline for a pre-engineering survey runs down a steep hill. Rather than measure horizontally downhill with the steel tape, the vertical angle was measured with a theodolite and the slope distance with an EDM. The vertical angle was 30\deg 22', turned to a prism pole 4.00ft above the ground. The slope distance from the theodolite to the prism was 82.18ft. The theodolite's optical center was 4.72ft above the upper baseline station at 2+72.32.(a) If the elevation of the upper station is 361.29ft, what is the elevation of the lower station?(b) What is the chainage of the lower station?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!