Question: Problem 4 . A footing is to be located 2 m below ground level, as shown below. The dimension of the footing is 1 .

Problem 4. A footing is to be located 2m below ground level, as shown below. The dimension of the
footing is 1.5m2m and carying a load of 2000kN. The results of the consolidation test is shom in
the figure
0.65
or the normally consolidated clay layer, if e 0=
b) A laboratory consolidation test on a specimen taken from the clay layer shown was tested. The
specimen was 25.4mm in thickness and drained on one side. The time required for the specimen
to reach 35% consolidation was 12min. Compute the required time (in months) for the clay
layer to settle 0.10 meter.
c) Estimate the expected consolidation settlement if the preconsolidation pressure is c**=130
kNm2.
d) estimate the excess pore water pressure remaining in the clay and the corresponding vertical
effective stress after 10 months at the middle of the clay layer
e) if the settlement analysis for a proposed structure indicates 10cm of settlement in 1 year and
an ultimate settlement of 30cm. this analysis is based on the assumption that the underlying
clay layer is drained at both its top and bottom surfaces. However, there are some indications
that there may be no bottom drainage. For this case, determine the ultimate sertlement and time
required for 10cm of settlement.
Problem 4 . A footing is to be located 2 m below

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!