Question: Problem 4 ( Adapted from Taha, 2 0 0 3 ) : Chemco operates two production facilities that manufacture a chemical compound for two customers
Problem Adapted from Taha, : Chemco operates two production facilities that manufacture a
chemical compound for two customers who demand respectively and tons per month. The
monthly production capacity of production facility is tons and that of production facility is
tons. The cost per ton of compound produced is $ at production facility and $ at production
facility Raw material for the two production facilities are provided by three suppliers, who are each
contracted to provide as much as tons of raw material at a cost of $ ton from supplier
$ ton from supplier and $ ton from supplier You may assume ton of raw material
produces ton of the compound. Chemco assumes the transportation cost of both the raw material
and the final compound. The costs per ton of transporting raw material from supplier to production
facility are given in the following table:
The costs per ton of transporting the final compound are given in the following table:
Part a: Formulate a minimum cost flow model to determine a minimum cost plan for transporting raw
material and producing and transporting compound. Note: For this problem, you should provide a
drawing of the minimumcost flow network. Explain in words what nodes and arcs represent, and label
nodes and arcs with all relevant data. If you need data, variables, or constraints that are not included in
the standard minimum cost flow model, make sure you define those to make the linear programming
formulation clear.
Part b: Solve the problem using an indexed model in AMPLCPLEX and report the obtained optimal
solution.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
