Question: Problem 7 . 5 The following data were measured at stream gauge station F 3 1 8 - R , Eaton Wash at Loftus Drive,

Problem 7.5
The following data were measured at stream gauge station F318-R, Eaton Wash at Loftus Drive, Los Angeles, for the storm of March 1,1983. Compute the direct runoff and baseflow distributions and the volume of direct runoff for each of the following (a) The constant-discharge method assuming direct runoff begins at 0404 standard time and (b) the constant-slope method assuming direct runoff begins at 0404 and ends at 1604.
\table[[Time,q(ft3s),Time,q(tt3s),Time,q(ft3s)
Answers should be a)1299 ac-ft
b)1031 ac-ft show work
Problem 7 . 5 The following data were measured at

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!