Question: Problem: Effective Subgrade Modulus / CBR If the CBR of the soil used in the upper 5 0 0 m m of embankment is 8
Problem: Effective Subgrade ModulusCBR
If the CBR of the soil used in the upper of embankment is and the of the
borrow soil used for preparing the thick compacted subgrade above embankment is
what is the effective subgrade ModulusCBR for design of flexible pavement?