Question: Problem ( { } ^ { n } 1 ) A Power Plant includes 1 5 gas turbine units operate on on compressor
Problem n
A Power Plant includes gas turbine units operate on on compressor and turbine have isentropic comprestion and simple Brayton eyche basis Thes cycles entering the compressor at I bar and K The pressure copansion efliciencies of and aif the air leaves the combustion clamber at K The ratio across the compressor is and electric generator efficiency is The net power combustion efreiency is and then uses gaseous fuel that has a lower heating value of of each gas forbine is MW The plami installation cost of the plant is $ mathrmkW and the mathrm~kJmathrmkg and costs $ mathrmsi The initial and turbine cycle plant. The company owner consortinate of cost is milinenyear for the pes operating a carbon capture and sequestration freition is exploring the feasibility of installing and and a MARR of There is also an operating kg tan The project has a financial life of years mathrmCO and a fixed capital cost of $ million for cost of $ ton to captare and transport the transmit mathrmCO from the plant and to inject for the capturing and pumping the mathrmCO facilitus to installation of a km pipeline to movect it into the aquifer. The transportation requires the installation costs about $ capacity for mathbfmathbf~ h r year and using mathbf~ k m Assuming that the plant is being operated with a full
Plot the Ts diagram and calculate:
The mass flow rate of air dotboldsymbolm throughout the cycle in fracmathrmkgmathrms and mathrmkgmathrmh
The heat added in mathrmkJmathrmkg and in MW
The cycle thermal efficiency.
The overall cycle efficiency
The heat rate heat added in mathrmkJmathrmkWh accounting for the combustion efficiency
The mass flow rate of the fuel used
The annual cost of the fuel used.
The levelized cot of energy LCOE:
a With carbon capture and sequestration and,
b Without carbon capture but including the Carbon Taxes as part of the opere cost
What would be your advice to the power plant owner consortium: to install and operate the carbon capture facility or to pay the carbon taxes in light of your analy above.
Please, make any reasonable assumptions for any parameters you see it is required. Y use the following properties
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock