Question: Procedure connected to Fully close flow control valve, turbine control valve and cooling water control valve Check the dynamometer mechanism, ensure that there is no

Procedure
connected to
Fully close flow control valve, turbine control valve and cooling water control
valve
Check the dynamometer mechanism, ensure that there is no load attached to the
dynamometer by loosening the adjusting screw.
Ensure that all lamps switches are closed.
Turn the clutch switch to "OFF" position to disengage the generator. This will
disconnect the turbine with the generator via the electric clutch
(1). Turbine 5. Turn on the ELCB, CB and power switch on control box.
(6) Lamps suizches
(7) Clutch switch
(8) pump motor switch
Procedure
connected to
Fully close flow control valve, turbine control valve and cooling water control
valve
Check the dynamometer mechanism, ensure that there is no load attached to the
dynamometer by loosening the adjusting screw.
Ensure that all lamps switches are closed.
Turn the clutch switch to "OFF" position to disengage the generator. This will
disconnect the turbine with the generator via the electric clutch
(1). Turbine 5. Turn on the ELCB, CB and power switch on control box.
(6) Lamps suizches
(7) Clutch switch
(8) pump mo
DDiiss
Procedure connected to Fully close flow control

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!