Question: Process time at a workstation is monitored using sample mean and range control charts. Six samples of n = 8 observations have been obtained and
Process time at a workstation is monitored using sample mean and range control charts. Six samples of n = 8 observations have been obtained and the sample means and ranges computed (in minutes):
| Sample | Mean | Range |
| 1 | 3.24 | 0.52 |
| 2 | 3.12 | 0.52 |
| 3 | 3.13 | 0.54 |
| 4 | 3.03 | 0.45 |
| 5 | 3.14 | 0.42 |
| 6 | 3.10 | 0.45 |
a. Using the factors in Table 10-3, determine the upper and lower limits for sample mean and range control charts. (Round the intermediate calculations to 2 decimal places. Round the final mean answers to 2 decimal places. Round the final range answers to 3 decimal places.)
| UCL | LCL | |
| Mean | ||
| Range | ||
b. Is the process in control?
multiple choice
-
Yes
-
No
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
