Question: Processing times (including setup times) and due dates for six jobs waiting to be processed at a work center are given in the following table.

Processing times (including setup times) and due
Processing times (including setup times) and due dates for six jobs waiting to be processed at a work center are given in the following table. Determine the sequence of jobs, the average flow time, average tardiness, and average number of jobs at the work center, for each of these rules: a FCFS b. SPT C. EDD d. CR Due Data (days from present time) Job A D E F Processing Time days) 2 B 4 10 5 12 7 16 4 17 15 18 Assume jobs arrived in the order shown