Question: Project: System reliability A telotometificatiot complatry aims to construct = new glass filre network that slowuld cover a laret geograplical area. The compotiy lats altecaly

Project: System reliability
A telotometificatiot complatry aims to construct = new glass filre network that slowuld cover a laret
geograplical area. The compotiy lats altecaly decided that this acswok should have a madular design. Thest is,
local networks will be cotesceled mulually. We will study the feliability of this [ibre gltass network. Design your
oun specadsheet model for your seliability calculutions.
The lncal nctworks
Various ltryours ate under consideration. Dependiag on the region sinc, a beal nerwok mey corbist or3,4,5 or
6 modes. We will examine the following layoul optiots.
Figure 1.1. L.apout optines for the boeal nerworks.
For the local netwotks, we assume that the nodes are 100% reliakie. The reliakelify of the filhre gltbs cables ate
a=1 idcrtical and cqual wo p.
The main network
The wotal network conkibs of the 13 local net works tlent are mulually connected by spoctial iaterregiotal cables.
Various besie shapes fie the main net work arc heing corsidered. rigure R.2. Lay wut spituns ler the main netwurh (each mete rcprosents a lacal nctwerh).
The nctwork is "up" if thare is an leat vne path comnceting cach pair of flocall rodbe in the netu urk. Son, wo
nocd buth the reliubility of each local netw urk and the reliahility of the imlerreviural eahles (denotod hy q) tos
calculate the systets reliability of the fill net work.
Qucstions abeat lecal netuurh rellialhaty
dislrihulion: BINOMIDIST(mumber_x.triahsprebahility_s.cumalative); wes the EXCFL help function fiur
details.
Pavriove 1.
the rellakility for theoe local netoworks in aspecalsheet for p.0.9,0.95 ind 0.99.
Pavalive 2.
What do the layout oplions 3B,4B, SB ind 6B for the lincal nctwork (Fgure 2.J) ham e in commtson? (Calculate
the reliahitity for theee local nefworks in a spectabheet for p.0.9,0.95 ind 0.99.
Pavaiove 3.
Give the minimal path vectorx and minimal cel vectors for layout option 4C: (Figars /1.). Fiplain huw the
to make calculatiots by nore).
Pavalioe 4.
Explain hew pivotal deostipooition can be uned se calculate the relithility uf local net work 4C.(Fegurv: I.I).
Pasainio 5.
Add formelas foe the reliablify of local network 4C (Figure /.I) to your spredubheet. Calculate the reliability
Pavaing 6.
spritadsheet and ealculare the reliahility of each loeal retwork type for p,0.9,0.95 and 0.92.
Qucstbus abeat the averall nctwerk reliability
Pasciove 7.
Calculuse in your spreadbheet the system relidhility for each of the five everall network layouls (Fagare 1.2)
asouming for the time beiry that all beal netw orks are 100% reliable and that the interropiorsal comneteisu
reliahility oquals 9.0.99.
(Q6&7only))
 Project: System reliability A telotometificatiot complatry aims to construct = new

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!