Question: (Projet of UAV for Cargo transportation. Create Work Breakdown Structure(WBS), Network diagram,Critical path and work packages in the critical path. Determine time of the project.)
(Projet of UAV for Cargo transportation. Create Work Breakdown Structure(WBS), Network diagram,Critical path and work packages in the critical path. Determine time of the project.)
For an unmanned aerial vehicle for cargo transportation project (including design, prototype development, production and test);
1) Create WBS for this project. (Must be at least 10 work packages)
2) Create the network diagram for this project (There must be at least two paths).
3) Find the critical path of this project and write down the work packages that are in the critical path. Determine the duration of the project.
Think simply. only have the above information. you will only show the work breakdown on drone design to transport cargo. For example: 1-design 1.1.-wing design 2-assembly 3-production must have at least 10 steps. and you must create the network diagram, there must be at least 2 ways. and indicate the steps included in this path. lastly, how long does this project take?
Please solve the question while not having any further information!!!