Question: Proposal .3: Project: Construction of a bridge. Objective: Construct a bridge ready for use. What will be delivered and when: a bridge ready for use
Proposal .3:
- Project: Construction of a bridge.
- Objective: Construct a bridge ready for use.
- What will be delivered and when: a bridge ready for use by; cars and heavy trucks, trains, and pedestrians. The project should only take 1 year.
- Success Criteria: The Bridge should be resistant to heavy floods and earthquakes.
- General description of the project activities: The project can be divided into 5 categories. The 5 categories are: preparing the ground (some of the activities are: cleaning the ground, adjusting the ground level), construction of the foundation (making the structure, buying materials), constructing the bridge (consulting the engineers), making security and control system, testing how robust and resistant is the bridge.
Note that other activities (in each category) should be added to complete the project.
- Define and list the different activities of the project (15 activities at least).
- Define the dependency between the project activities and choose duration for each activity.
- Draw the project network diagram (A-O-N method).
- List the critical path(s) in the project and the project duration.
- Compute the slack time for the project.