Question: Public Health and Safety Delay in Addressing Fire Code ViolationsEngineer A , a fire protection engineer, is retained by Client to provide a confidential report
Public Health and Safety Delay in Addressing Fire Code ViolationsEngineer A a fire protection engineer, is retained by Client to provide a confidential report in connectionwith the possible renovation of an old apartment building owned by Client. Engineer A conducts anaudibility test of the fire alarm inside occupied residential units. The audibility test showed the alarm couldnot be heard within all of the residential units, which is in violation of the local fire code. The problem withthe alarm may have existed since the time the building was constructed or when the fire alarm system wasreplaced in Engineer A advises the Client regarding the results of the audibility tests and the code violation. In a followup telephone conversation with Client, Engineer A is told that the financing for the renovation has fallenthrough and that the renovation project will be delayed, which means that the problems with the fire alarmsystem will not be addressed immediately but in the future when funding is available. Engineer A is paidfor his services.Questions:a Problem statement: Give a short formulation of the problem that is at stake in this case.b Options for action: Engineer A has various options for action in this case. Make a list of optionsfor actions from which he or she can choose.c Intuitive answer: What would you do in this case if you were Engineer A
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
