Question: q 2 , A project manager is tasked with estimating the duration of three critical tasks in a construction project: foundation laying, building structure, and
qA project manager is tasked with estimating the duration of three critical tasks in a construction project: foundation laying, building structure, and interior finishing. The manager gathers input from relevant stakeholders and obtains the following estimates for each task:
Foundation Laying:
Optimistic Time O: days
Most Likely Time M: days
Pessimistic Time P: days
Building Structure:
Optimistic Time O: days
Most Likely Time M: days
Pessimistic Time P: days
Interior Finishing:
Optimistic Time O: days
Most Likely Time M: days
Pessimistic Time P: days
Using the Program Evaluation and Review Technique PERT calculate the expected duration and standard deviation for each task.
do not copy please, this q for System Analysis and Design
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock