Question: Q.1. For doing packer test in field, a bore hole of 30 cm in diameter is drilled into a soil. After completion of the

Q.1. For doing packer test in field, a bore hole of 30

Q.1. For doing packer test in field, a bore hole of 30 cm in diameter is drilled into a soil. After completion of the bore hole, two packers are set on a pipe in the bore hole such that the perforated portion of the pipe between the packers is 3.5 m. For testing, water is made to enter (discharge) into the bore hole at the rate 0.8 m/min under a pressure head of 2 m. Determine co-efficient of permeability of the soil in cm/sec. Hint: this assignment is related to field tests (pumping-in tests) for determining co- efficient of permeability of soil. Study pages 91 and 92 of the uploaded notes (week 6,7 and 8 lectures)

Step by Step Solution

3.33 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Given that Q 08 mmin msec 08 60 2 00133 msee Bore hole dia... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!