Question: Q2 Afro Maintenance is a small aircraft wing maintenance facility located in Seattle, Washington. They decides to improve material flow in the facility, using the

Q2

Afro Maintenance is a small aircraft wing maintenance facility located in Seattle, Washington. They decides to improve material flow in the facility, using the load-distance method.

The current process layout of facility is shown in below. The distance between adjacent departments have 10 feet (ex: distance between Entrance office and Receiving room is 10 feet), and distance between diagonal departments are 20 feet (ex: Entrance and Assembly room is 20 feet). Also, nonadjacent departments, such as the Entrance and Parts Room are 20 feet apart, and nonadjacent rooms, such as entrance and Inspection Room are 30 feet apart.

Afro Maintenance Process Layout

Entrance Office, 1

Receiving Room, 2

Parts Room, 3

Metallurgy Room, 4

10

Breakdown Room, 5

Assembly Room, 6

Inspection Room, 7

Test Room, 8

10 feet

10

10

Number of Material movements (loads) between departments in one month.

1

2

3

4

5

6

7

8

100

100

0

0

0

0

0

1 Entrance

0

50

20

0

0

0

2 Receiving Room

30

30

0

0

0

3 Parts Room

20

0

0

20

4 Metallurgy Room

20

0

10

5 Breakdown Room

30

0

6 Assembly Room

0

7 Inspection Room

8 Test Room

Given the information, compute the total load-distance score in one month.

Node (Route)

Distance

Load

Load-Distance Score (D * L)

1-2

10

100

1,000

1-3

20

2-4

2-5

20

3-4

3-5

4-5

4-8

5-6

5-8

6-7

Total L-D Score

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!