Question: *Quality control 1. A project team is studying the downtime cost of a soft-drink bottling line. Data analysis in thousands of ringgits (RM) for a
*Quality control
1. A project team is studying the downtime cost of a soft-drink bottling line. Data analysis in thousands of ringgits (RM) for a 3 month period as stated in table. Construct a Pareto diagram for this analysis.

2. Table show a wrong ranking done by FMEA engineer during establishing the Severity (SEV) Ranking Criteria of he brake sub-assembly of a car. Rearrange the criteria and rating according to right concept of SEV ranking.