Question: Quality control (hello ,sorry ,i need an answer within 30 to 20 minutes ,please) Q2/ Draw the network diagram for the next project, then rate
Quality control
Q2/ Draw the network diagram for the next project, then rate (u) and (v) that include two or more critical paths for the project. Find the critical project time? Pre. Act. Activity A B C D E F G H I J K L M N A A A A C,D F G B B E E HJ,K I,L,M Duration 13 4 8 4 17 u 13 13 14 6 V 3 8 11 (hello ,sorry ,i need an answer within 30 to 20 minutes ,please)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock