Question: Question 1 ( 4 0 points ) : For the geometric and traffic characteristics shown below, each approach was assumed to have one dedicated left
Question points:
For the geometric and traffic characteristics shown below, each approach was assumed to have
one dedicated leftturn lane, one through lane, and one throughright lane.
Calculate the signal cycle length and phase lengths for the intersection using the
Webster method. points
Recalculate the signal cycle length of Question using the HCM method and an
intersection critical ratio of points
Assume the following saturation flows:
Through lanes:
Throughright lanes:
Left lanes:
Leftthrough lanes:
Leftthroughright lanes:
Assume the phasing scheme:
Assume yellow time per phase is seconds; the allread interval is second. The lost time of
each phase is the total of yellow time and allred time.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock