Question: Question 1 a. Do a scheduling table based on any Charity Run in weeks. b. Draw a network diagram based on question (a). c. Calculation

Question 1 a. Do a scheduling table based on any

Question 1

a. Do a scheduling table based on any Charity Run in weeks.

b. Draw a network diagram based on question (a).

c. Calculation of completion time.

2.2 Planning Stage In this stage students need to elaborate: 2.2.1 Schedule - Students need to show their specific activity to be performed at each stage in a table form as well as transferred in a form of network diagram. 0 Scheduling table activities 2 Network diaguan include 2 qualita culculation on completion time. 2 inse