Question: this course is manufacturing operation management 1. A machine operator has to perform three operations, turning, threading and knurling on a number of different jobs.


this course is manufacturing operation management
1. A machine operator has to perform three operations, turning, threading and knurling on a number of different jobs. The time required to perform these operations (in minutes) on each job is known. Identify the sequence in which the jobs should be processed in order to minimize the total time required to turn out all the jobs also calculate the minimum elapsed time and idle time for turning, threading and knurling machines. 2 3 4 5 6 1 3 12 11 2 9 5 Job Turning Threading Knurling 8 13 6 14 1 13 6 12 3 8 4 9 EMESTE AY 2020-2021 Max Marks: 5 Marks 1. A machine operator has to perform three operations, turning, threading and knurling on a number of different jobs. The time required to perform these operations in minutes) on each job is known. Identify the sequence in which the jobs should be processed in order to minimize the total time required to turn out all the jobs also calculate the minimum elapsed time and idle time for turning, threading and knurling machines. 1 2 3 4 5 3 11 2 9 5 Job Turning Threading Knurling 8 13 12 6 14 1 13 6 12 3 8 4 9Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
