Question: Question 1 Product quality: a) Is based upon customer expectations b) Measures the degree to which design specifications are met c) Is not related to
Question 1
Product quality:
a) Is based upon customer expectations
b) Measures the degree to which design specifications are met
c) Is not related to operations and supply chain
d) Is based primarily upon brand reputation
e) Is affected only by design quality
Question 2
The camera on my phone takes crisp, sharp, true to color photos. This is which quality dimension?
a) Durability
b) Performance
c) Reliability
d) Conformance
e) Perceived quality
Question 3
According to the cost of quality concept, if quality is poor, which single cost is normally the greatest?
a) They are all equal
b) Prevention
c) External failure
d) Appraisal
e) Internal failure
Question 4
For a hotel, which is an external failure?
a) Sending housekeeping to fix a problem in a room
b) A bad review by a guest on a social media site such as Trip Advisor
c) Doing routine maintenance on the elevator
d) Purchasing updated furniture
e) Training the front desk staff
Question 5
Six Sigma:
a) Can increase the number of defects
b) Uses the PDCA methodology
c) Used the 5S methodology
d) Focuses on reducing waste
e) Is led by highly trained experts
Question 6
Specific processes that affect quality are identified during which step of DMAIC?
a) Define
b) Control
c) Analyze
d) Improve
e) Measure
Question 7
To monitor if a process is operating according to normal limits or if something has changed use a:
a) Pareto chart
b) Process map
c) Check sheet
d) Process control chart
e) Scatter diagram
Question 8
Just-in-time:
a) Is one tool that is used in lean.
b) Is another name for the Toyota Production System.
c) Is a technique for error proofing.
d) Typically increases inventory levels.
e) Focuses on improving quality.
Question 9
What does NOT improve order processing accuracy?
a) Increasing the ease of use of the on-line catalog
b) Increasing the number of phone orders
c) Redesigning the order filling system to reduce errors
d) Integrating the on-line ordering and operations information systems
e) Reducing the orders that are entered manually
Question 10
Ensuring that truck drivers comply with government regulations on driving time is an activity of:
a) Network design
b) Transportation management
c) Order processing
d) Inventory management
e) Distribution management
Question 11
Consistency in delivery times is:
a) Frequency
b) Speed
c) Availability
d) Capability
e) Dependability
Question 12
Which mode would most likely be used to transport coal 800 miles from a mine in Wyoming to a power plant in Arizona?
a) Truck
b) Intermodal
c) Air
d) Water
e) Rail
Question 13
The fact that the fixed costs of transportation equipment are spread over a larger number of miles results in:
a) Dependability
b) Economy of distance
c) Cost to service tradeoff
d) Economy of scale
e) Consolidation
Question 16
What is NOT a reason for the high costs with last mile delivery?
a) Only a few packages are delivered to each location
b) Packages must be delivered to many different individual locations
c) The process is labor intensive
d) Problems with parking and traffic congestion
e) Only courier delivery services can be used
Question 17
The distribution function in which large shipments from many sources are sorted and flow through without being stored to outbound vehicles for different destinations is called:
a) Cross-docking
b) Scheduled consolidation
c) Order picking
d) Reverse logistics
e) Break-bulk
Question 18
In a distribution center, the process of selecting items and putting them together in individual customer orders is:
a) Receiving and unloading
b) Order picking
c) Consolidation
d) Staging
e) In-storage handing
Question 19
What LEAST likely to be an important factor in network design?
a) Taxes
b) Distance from important suppliers
c) Labor
d) Level of automation
e) Cost of labor
Question 20
A project typically:
a) Involves people from a number of different functions
b) Has activities that are routine and often repeated
c) Rarely competes for resources
d) Has low variety
e) Should always be completed at the lowest possible cost
Question 21
In a successful project:
a) Project managers must simultaneously meet the scope, schedule, and budget
b) Budgets are usually exceeded
c) Scope should be traded-off for a faster time
d) Meeting the budget is the most important factor
e) The scope should change throughout the project
Question 22
What is not a social factor that affects project success?
a) Communication
b) Vision
c) Behavior & values
d) Leadership
e) Process
Question 23
A work breakdown structure (WBS) is used during stage in a projects lifecycle?
a) Execution
b) Definition
c) Planning
d) Identification
e) Completion
Question 24
A project that is housed outside existing departments and controlled entirely by the project manager is using which structure?
a) Matrix
b) Pure
c) Focused
d) Charter
e) Functional
Question 25
The project manager is providing weekly status reports on the projects progress during execution compared to its schedule. What tool should be used?
a) WBS report
b) Gantt chart
c) Contingency plans
d) Critical path method network diagram
e) Project charter
Please help me!!!!
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
