Question: Question 10 1 pts The duration for a project is 16 time units and the total direct cost is $1,400. Use the information below to

Question 10 1 pts The duration for a project is
Question 10 1 pts The duration for a project is 16 time units and the total direct cost is $1,400. Use the information below to crash one-time unit per move using the least cost method. Reduce the schedule until you reach the crash point of the network. Activity Predecessor Crash Cost Max Crash Time Normal Time Normal Cost None 100 1 2 N 150 B A 80 1 3 100 C B 60 1 2 200 D B 40 1 5 200 E A 40 2 5 200 NN F 40 2 3 150 G D 20 1 5 200 H E, F, G 0 0 1 200 The adjusted total cost after the crash point has been reached is $