Question: Question 17 (2 points) An activity on a PERT network has these time estimates: optimistic = 2, most likely = 5, and pessimistic = 10.

Question 17 (2 points) An activity on a PERT

Question 17 (2 points) An activity on a PERT network has these time estimates: optimistic = 2, most likely = 5, and pessimistic = 10. Its expected time is 17 0.533 5.67 5.0 5.33