Question: Question 2 (3 points) The difference between the upper specification and the lower specification for a process is 2.2. The standard deviation is 0.10. Based
Question 2 (3 points) The difference between the upper specification and the lower specification for a process is 2.2. The standard deviation is 0.10 . Based on the given information, the process capability ratio (round your response to two decimal places) is