Question: Question 23 (2 points) Listen In the Material Planning process there are several key data in the Material Master. Match the below Material Master Data

Question 23 (2 points) Listen In the Material

Question 23 (2 points) Listen In the Material Planning process there are several key data in the Material Master. Match the below Material Master Data with its definition, types or examples. Defines the strategy the system uses to determine whether a quantity of material will be available to promise. A period of time in which the ERP system is not allowed to automatically change procurement proposals. In house, externally or both. 1. Procurement Type A method to determine which BOM to use. 2. MRP Type 3. Lot Size Key A DOO The manner in which a CIR (actual customer order) consumes a PIR (planned independent requirement). 4. Scheduling Times 5. Planning Time Fence Make-to-stock, make-to- order or assemble-to-order 6. BOM Selection Method 7. Availability Check Group If produced in house includes: time needed to produce material plus Goods Receipts processing time. 8. Strategy Group 9. Consumption Mode If externally procured: planned delivery time plus the goods receipt processing time. Static lot sizing, fixed lot sizing, lot-for-lot, period lot sizing, optimum lot sizing. Consumption based planning, Material Requirement Planning (MRP) or Master Production Scheduling (MPS)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!