Question: Question 3) A process that is considered to be under control measures an ingredient in ounces. Below are the last 10 samples (each of size
A process that is considered to be under control measures an ingredient in ounces. Below are the last 10 samples (each of size n=5 ) taken. The population standard deviation is 1.36. a) What is the process standard deviation? What is X ? Answer: Sigma =1.36 Sigma X-bar =0.608 b) If z=3, what are the control limits for the mean chart