Question: Question 37 (2 points) As discussed in the textbook, in a Kanban-based production control system the number of kanban card sets required must be calculated.

Question 37 (2 points) As discussed in the
Question 37 (2 points) As discussed in the textbook, in a Kanban-based production control system the number of kanban card sets required must be calculated. If expected demand during lead time = 1.200 per hour, safety stock is set at 5% of usage container size = 2 units and the lead time to produce a batch = 10 hours, the correct value for the number of kanban card sets required is: (Hint: if necessary, round to nearest whole integer) D.L. (1+S) km a) 5,500 b) 6.500 c) 5.000 d) 6.300 e) 7.000