Question: Question 5 5 pts In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected

Question 5 5 pts In setting up a Kanban control

Question 5 5 pts In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours, what is the number of Kanban card sets needed? Edit View Insert Format Tools Table