Question: In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time

In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 10% of the demand during lead time, the container size is 15 . If the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed? Numeric Response
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts