Question: Question 6 (10 points) Saved Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs

Question 6 (10 points) Saved Reducing Project
Question 6 (10 points) Saved Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are: $550 (20 time units), $400 (19). $350 (18), $100 (17), and $50 (16). Activity Normal Normal Time Cost F 6 B Crash Max. Cost Crash (Slope) Time 25 1 75 2 0 0 20 1 65 3 4 5 3 70 90 100 80 100 140 D G D E 6 105 3 1 1 40 80 F G H 1 6 3 0 0 90 210 200 5 After crashing the project using the cost-duration graph method, determine the duration of the project associated with the optimum cost-time point. Question 6 (10 points) Saved Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are: $550 (20 time units), $400 (19). $350 (18), $100 (17), and $50 (16). Activity Normal Normal Time Cost F 6 B Crash Max. Cost Crash (Slope) Time 25 1 75 2 0 0 20 1 65 3 4 5 3 70 90 100 80 100 140 D G D E 6 105 3 1 1 40 80 F G H 1 6 3 0 0 90 210 200 5 After crashing the project using the cost-duration graph method, determine the duration of the project associated with the optimum cost-time point

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!