Question: Question 2 (10 points) Saved Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs

Question 2 (10 points) Saved Reducing Project
Question 2 (10 points) Saved Reducing Project Duration Crash cost (slope), maximum crash time, normal time, and normal cost are provided below. The indirect costs for each project duration are: $550 (20 time units), $400 (19). $350 (18), $100 (17), and $50 (16). Normal Normal Time Cost c 6 Crash . . Actity Cost Crash (Slope) Time A 25 1 B 75 o 0 D 20 1 E 65 3 F 105 1 G 40 1 H 0 11 200 1 4 5 3 D G 6 3 70 90 100 80 100 140 80 90 210 H 5 After crashing the project using the cost duration graph method, determine the cost of the project associated with the optimum cost-time point. 1475

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!