Question 8 (1 point) Saved Problem data: Your department has received the five jobs shown in the table. Sequence the jobs using the shortest processing time (SPT) rule and calculate the resulting average flow time. Time (days) Estimated since days Days until Job arrival required due E What would be the average flow time if the SPT rule was used? 1) 10.2 O2) 13.2 3) 17.4 O 4) 4.2