Question: Question : Question : 1.Identify the risk associated with your project 2.Determine the probability of occurrence 3.The impact the difficulty in detection 4.Link the work
Question :
Question : 1.Identify the risk associated with your project
2.Determine the probability of occurrence
3.The impact the difficulty in detection
4.Link the work breakdown structure to the respect on a structure term in terms of all the factors including Technicalities, Organizational Risk, Customer Risk ,Project Management Risk, Try to connect them.
Project
House project Work breakdown structure (WBS) for building a 5,500 sq ft house, including estimated durations for each task: Project Deliverable: Complete House
1.1Sub-Deliverable: Design and Planning
1.1.1 Task: Architectural Design (30 days) 1.1.2 Task: Structural Engineering (20 days) 1.1.3 Task: Building Permits and Approvals (45 days) 1.2 Sub-Deliverable: Site Preparation 1.2.1 Task: Land Clearing (7 days) 1.2.2 Task: Excavation and Grading (14 days) 1.2.3 Task: Utility Connections (10 days) 1.2.4 Task: Foundation Design and Excavation (21 days) 1.3 Sub-Deliverable: Construction 1.3.1 Task: Framing and Roofing (40 days) 1.3.2 Task: Exterior Finishes (30 days) 1.3.3 Task: Interior Walls and Partitions (15 days) 1.3.4 Task: Plumbing and Electrical Systems Installation (30 days) 1.3.5 Task: HVAC Installation (20 days) 1.3.6 Task: Insulation and Soundproofing (10 days) 1.3.7 Task: Flooring Installation (15 days) 1.3.8 Task: Interior Finishes (25 days) 1.3.9 Task: Cabinetry and Countertop Installation (20 days) 1.3.10 Task: Fixture and Appliance Installation (10 days)
1.4 Sub-Deliverable: Exterior 1.4.1 Task: Landscaping and Outdoor Amenities (20 days) 1.4.2 Task: Driveway and Walkway Construction (14 days) 1.4.3 Task: Fencing and Gate Installation (10 days) 1.4.4 Task: Exterior Lighting Installation (7 days) 1.5 Sub-Deliverable: Finalization and Inspection 1.5.1 Task: Final Touches and Clean-up (10 days) 1.5.2 Task: Quality Assurance and Inspection (15 days) 1.5.3 Task: Final Building Code Compliance Check (5 days) 1.5.4 Task: Obtaining Occupancy Permit (30 days) 1.6 Sub-Deliverable: Project Closeout 1.6.1 Task: Documentation and Record Keeping (5 days) 1.6.2 Task: Warranty and Maintenance Information (5 days) 1.6.3 Task: Final Financial Review and Closure (10 days) Please note that the durations provided are rough estimates and can vary based on factors such as project complexity, availability of resources, and external dependencies.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
