Question: Reducing setup and lead times Large batch sizes The elimination of disruptions Question 9 Which two terms reflect scheduling issues in low - volume systems?

Reducing setup and lead times
Large batch sizes
The elimination of disruptions
Question 9
Which two terms reflect scheduling issues in low-volume systems?
line balancing and flow control
run size and run time
assignment method and appointments
Gantt charts and run time
sequencing and load control