Question: Refer to lable 56.1. Factors for Computing Control Chart Limits.sigmafor this proble Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every

Refer to lable 56.1. Factors for Computing
Refer to lable 56.1. Factors for Computing Control Chart Limits.sigmafor this proble Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour R Hour 1 2 3 x 3.25" 3.10 3.22 3.39 3.07 2.86 0.71" 1.13 1.48 1.21 1.12 0.42 7 8 9 10 11 12 X 2.95" 2.55 2.92 2.95 2.93 2.97 R 0.489 1.18 0.71 1.28 1.22 0.40 Hour 13 14 15 16 17 18 x R 3.21" 0.90 2.93 1.26 3.12 1.06 2.84 0.55 2 86 1.38 2.74 1.24 Hour 19 20 21 22 23 24 X 3.31" 2.89 2.75 3.18 3.04 2.74 R 1.66" 1.09 1.08 0.51 1,58 0.92 5 6 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with fur Upper Control Limit (UCL ) - inches (round your response to three decimal places). Lower Control Limit (LC) - inches (round your response to three decimal places)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!