Question: Refer to the table Factors for Computing Control Chart Limits (3 sigma) LOADING... for this problem. A process at Amit Eynan Bottling Company that is
Refer to the table
Factors for Computing Control Chart Limits (3 sigma)
LOADING...
for this problem.
A process at Amit Eynan Bottling Company that is considered in control measures liquid in ounces. Below are the last 12 samples taken. The sample
size=4.
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 20.2 | 19.9 | 19.8 | 20.1 | 19.8 | 19.7 | 20.2 | 20.1 | 20.0 | 19.9 | 20.1 | 19.9 |
| 20.1 | 19.9 | 19.9 | 19.9 | 20.1 | 19.6 | 20.1 | 20.1 | 19.9 | 19.8 | 20.1 | 19.4 |
| 19.8 | 19.7 | 20.0 | 19.9 | 20.1 | 19.7 | 19.9 | 19.8 | 20.1 | 20.1 | 19.8 | 19.7 |
| 19.9 | 20.1 | 20.1 | 19.8 | 19.9 | 19.4 | 19.9 | 19.7 | 19.8 | 19.9 | 19.9 | 19.8 |
Part 2
a) Set control limits for this process for the
x-chart.
UCLx=enter your response here
ounces (round your response to two decimal places).
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
