Question: Scenario: A program comprising 1 5 0 instructions is executed on a processor with a 4 - stage pipeline. This pipeline encounters control hazards due
Scenario:
A program comprising instructions is executed on a processor with a stage pipeline. This pipeline encounters control hazards due to branch instructions. The processor utilizes a branch prediction technique with a accuracy rate, and each mispredicted branch incurs a cycle penalty due to the need to flush and refill the pipeline.
Task:
Calculate the total execution time of the program in cycles, considering the impact of control hazards from branch instructions, and compute the overall Cycles Per Instruction CPI
Assumptions:
Total Instructions:
Branch Instructions:
Branch Prediction Accuracy:
Misprediction Penalty: cycles
Calculations:
a Calculate the total number of cycles for instructions without considering control hazards.
b Determine the number of correctly predicted branches and
c the number of mispredictions.
d Calculate the additional cycles incurred due to mispredictions.
e Compute the total execution time by adding the base cycles and the penalty cycles.
f Calculate the overall CPI by dividing the total execution time by the number of instructions.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
