Scenario C
conosac has finally acquired its new warehouse. The manager wants the new warehouse to be divided into four sections (A, B, C, D) and for each of the sections to be set up for a specific function: apple sorting (station 1), washing (station 2), packaging (station 3) and, finally, boxing for transport (station 4).
For the development of its new warehouse, conosac conducted a study of travel between stations.
Trips per day Towards | ||||
towards of | 1 | 2 | 3 | 4 |
1 | - | 5 | 10 | 15 |
2 | 25 | - | 25 | 15 |
3 | 5 | 10 | - | 20 |
4 | 5 | 10 | 30 | - |
The distance between sections is as follows:
Distance (in meters) | ||||
Between | A | B | C | D |
A | - | 20 | 35 | 50 |
B | - | - | 25 | 60 |
C | - | - | - | 15 |
D | - | - | - | - |
The warehouse plan is as follows:
A | C | D |
B |
Question
Use the travel count method to determine where each position will be located. (30 points, of which 5 are allocated for your approach)