Question: SCM 4 5 3 - HOMEWORK # 5 NAME: q , A well - known, beauty products manufacturer produces and sells a line of premium

SCM 453- HOMEWORK #5
NAME: q,
A well-known, beauty products manufacturer produces and sells a line of premium hair coloring in twenty-two shades of brown, blonde, red and black. They all require the same basic chemicals however. The purchase plan for the three most popular shades of coloring must be determined for the next ten weeks. Marketing forecasts are given as follows:
\table[[WEEKLY DEMAND FORECAST (in units),],[Shade,1,2,3,4,5,6,7,8,9,10],[\table[[Blonde],[8A]],1500,1450,1550,1650,2000,1900,1800,1650,1550,1450],[\table[[Brown],[6B]],1110,1140,1150,1160,1160,1180,1190,1210,1160,1140],[\table[[Black],[2C]],1300,1350,1375,1450,1500,1450,1375,1350,1300,1300]]
It takes one week to produce the coloring, with a production run lot size of 250 units for Blonde 8A,50 units for Brown 6B, and 100 for Black 2C. Safety stock requirements are 50,10, and 25 respectively.
There are currently 1600 Blonde 8A units on hand. Additionally, there are currently 1225 Brown 6B units and 1325 Black 2C units on hand. According to the production planners, all other ingredients for the coloring are readily available and should cause no delay in producing the finished product, with the exception of the common oxidizing agent, Volume 20 Hydrogen Peroxide and the coated aluminum tubes used for packaging.
Each unit requires 4 ounces of Hydrogen Peroxide. How many gallons of Volume 20 Hydrogen Peroxide do you need each week, knowing that one ounce equals 0.0078125 gallons (round up to the nearest whole gallon)? This product is purchased in 55 gallon drums. With 178 gallons remaining in stock, and a one week lead time, complete an MRP table for Hydrogen Peroxide as well. Safety stock requirement is 25 gallons.
Finally, all three shades use the same coated aluminum needed for the packaging tubes, which comes in 500 foot coils. The aluminum coils are already cut to the exact width needed for making the tubes. Each unit requires 6 inches of coated aluminum, so how many feet of aluminum do you need each week? When do we need to order this, given a one week lead time, 2475 feet currently in stock, and no safety stock requirement? Complete an MRP table for coated aluminum to answer this question.
Complete the five MRP tables using the template on WesternOnline to answer these questions and submit via Dropbox. I encourage you to use formulas in your spreadsheet to simplify the process for yourselves. In case you aren't familiar with them, use the "CEILING" function for accommodating the lot size, as well as the "ROUNDUP" function for the materials, in addition to the basic mathematical formulas.
 SCM 453- HOMEWORK #5 NAME: q, A well-known, beauty products manufacturer

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!